Ingwa Power To Survey 8 MW Project In Panchthar
March 17, 2023 | Investopaper
Ingwa Power Limited is planning to develop Lower Ingwa Khola Hydropower Project in Panchthar district. The company has received the permission from the Department of Electricity Development to survey the project.
The Department granted the survey license to the company on Falgun 18, 2079 BS. The survey license is valid until Falgun 17, 2081 BS.
Lower Ingwa Khola Hydropower Project is a Run of the River type project with an installed capacity of 8 MW. The project will be located in Panchthar District.
After completing the survey within the given time period, the company can then apply for the construction permit.
Suggested Readings:
List Of Hydropower Projects Under Construction In Nepal