Snowfall Hydropower To Survey 29 MW Tejo Thogam Khola Hydropower Project
June 6, 2022 | Investopaper
Snowfall Hydropower Pvt. Ltd is planning to construct Tejo Thogam Khola Hydropower Project in the Sankhuwasabha district. The company has received the permission from the Department of Electricity Development to survey the project.
The Department granted the survey license to the company on Baisakh 12, 2079 BS. The survey license is valid until Baisakh 11, 2081 BS.
Tejo Thogam Khola Hydropower Project is a run of the river type project with an installed capacity of 29 MW. The project is located at Hatiya (Sankhuwasabha).
After completing the survey within the given time period, the company can then apply for the construction permit.
Suggested Readings:
List Of Hydropower Projects Under Construction In Nepal